Chudley and Greeno's Building Construction Handbook

£17.495
FREE Shipping

Chudley and Greeno's Building Construction Handbook

Chudley and Greeno's Building Construction Handbook

RRP: £34.99
Price: £17.495
£17.495 FREE Shipping

In stock

We accept the following payment methods

Description

Please include what you were doing when this page came up and the Cloudflare Ray ID found at the bottom of this page.

Roger Greeno has gained extensive experience of the construction industry, commencing as a craft apprentice and progressing to a combined professional and academic career. Benchmark checklist ~ an initiative that places responsibilities on manufacturers and installers to provide equipment of an appropriate standard for the situation.

As regulations they are secondary legislation or a Statutory Instrument effected under an Act of Par­ liament. The results of this test in terms of the number of blows and amount of penetration will need expert interpretation.

Particle size distribution This is the percentages of the various particle sizes present in a soil sample as determined by sieving or sedimentation. It is an obligation for duty holders to demonstrate that they have the necessary resources, experience and qualifications to undertake the work. Rating is alphabetical from A to G–A the highest grade for energy efficiency with lowest impact on environmental damage in terms of CO2 emissions.

Undisturbed soil samples These are soil samples obtained using coring tools that preserve the natural structure and properties of the subsoil. This is to be achieved by risk assessment and awareness by all persons on a building site by creating an integrated and planned approach to anticipation of health and safety issues through project supervision and forward planning. Building control The Building Regulations 2010 and associated Approved Document L: Conservation of Fuel and Power. Note: All five construction practice details include the critical areas of junctions and interfaces between wall and roof, ground and intermediate floors.

Applies to all building, civil engineering and works of engineering construc­ tion involving more than 500 employee days or exceeding 30 days with more than 20 operatives working simultaneously. General considerations Before any specific considerations and decisions can be made regarding site layout, a general appreciation should be obtained by conducting a thorough site investigation at the pre-tender stage and examining, in detail, the drawings, spe­ cification and Bill of Quantities to formulate proposals of how the contract will be carried out if the tender is successful. In total there were 20 papers and 24 presenters, coming from 10 different countries (Algeria, Australia, Canada, France, Iran, Korea, Turkey, Saudi Arabia, UK and USA). Reference should be made to the relevant document for specific requirements but the broad areas covered can be shown.

Chudley’, as it is affectionally known by many who have made use of the extensive coverage in their teaching and studies in the built environment over nearly four decades, remains one of the bestselling construc­ tion books in the UK. This feedback coincided with Roger’s desire to reduce the amount of time he spent working on the book and increase the amount of time he spent with his grandchildren (and fishing).



  • Fruugo ID: 258392218-563234582
  • EAN: 764486781913
  • Sold by: Fruugo

Delivery & Returns

Fruugo

Address: UK
All products: Visit Fruugo Shop